logo

Arun-3 Hydroelectric Project

Sector: Commercial • Location: Nepal

Source: World Bank Group

Project
Active

The project entails the construction of hydroelectric utilities on the Arun River in the Sunkhuwashabha District of Nepal. The dam will be 70m tall and the headrace tunnel will be 11.7 km long. The underground powerhouse will contain four 225-MW vertical Francis turbine-generator units. Electricity from the project will be exported to India via a 217-km-long 400-kV double circuit transmission line

Project Information FAQ

Project Information

5 Q
The project “Arun-3 Hydroelectric Project” is an infrastructure initiative in the Commercial sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction of hydroelectric utilities on the Arun River in the Sunkhuwashabha District of Nepal. The dam will be 70m tall and the headrace tunnel will be 11.7 km long. The underground powerhouse will contain four 225-MW vertical Francis turbine-generator units. Electricity from the project will be exported to India via a 217-km-long 400-kV double circuit transmission line. The capacity of the facility is 900 MW. Annually, the facility is expected to generate about 3,685 GWh and power from the project will be exported from Dhalkebar in Nepal, to Muzaffarpur in India. The project is being developed by SJVN through wholly owned subsidiary SJVN Arun-3 Power Development Company. SJVN - a joint venture between the federal government of India and the Himachal Pradesh state government - received the allocation to develop the project on a build-own-operate-transfer basis, for a period of 30 years, in March 2008. The power distribution agreement for the project, which provides 21.9% free power to Nepal for the 25-year concession period, was signed by Investment Board Nepal and SAPDC. The $841.9 million (Rs 6,333.40-crore) loan was arranged by a consortium of banks, which includes: State Bank of India, Punjab National Bank, Export-Import Bank of India, Canara Bank, Union Bank of India, Everest Bank Ltd and Nabil Bank. The plant was financed on a 100:0 debt-to-equity ratio. The project entered into construction stage on May 11, 2018 and the debt financing was signed on 22 February, 2022. Realfin https://himachaltonite.com/himachal/sjvns-arun-power-subsidiary-signs-inr-6333-crore-loan-agreement/ https://www.business-standard.com/article/companies/sjvn-signs-papers-to-get-rs-6-333-cr-loan-for-arun-3-hydro-project-in-nepal-122022201418_1.html https://www.hydroreview.com/business-finance/sjvn-signs-loan-agreement-to-advance-900-mw-arun-3-hydroelectric/#gref https://economictimes.indiatimes.com/news/politics-and-nation/modi-oli-jointly-lay-foundation-stone-of-900-mw-arun-iii-hydroelectric-power-plant/articleshow/64128226.cms

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data