Arun-3 Hydroelectric Project
Sector: Hydro • Location: Simara, Nepal
Source: The Hawk
The Arun-3 Hydroelectric Project is a 900 MW run-of-the-river hydropower project developed by SJVN Limited, an Indian public sector enterprise. It utilizes Nepal's water resources to meet India's increasing energy needs, provides free electricity to Nepal, and supports local economic opportunities including rural electrification and infrastructural development.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT)
- Location
- Simara, Nepal
- Updated
- 22 Jul 2026
- Source
- The Hawk
ConstructChat
Ask ConstructChat about Arun-3 Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arun-3 Hydroelectric Project is a 900 MW run-of-the-river hydropower project developed by SJVN Limited, an Indian public sector enterprise. It utilizes Nepal's water resources to meet India's increasing energy needs, provides free electricity to Nepal, and supports local economic opportunities including rural electrification and infrastructural development. |
Original sector | Energy |
Location
Country | Nepal |
City | Simara |
Source
Source | The Hawk |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2025-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
