logo

Arun-3 Hydroelectric Project

Sector: Water Supply and Storage • Location: Nepal

Source: World Bank Group

Project
Active

The project entails the construction of hydroelectric utilities on the Arun River in the Sunkhuwashabha District of Nepal. The dam will be 70m tall and the headrace tunnel will be 11.7 km long. The underground powerhouse will contain four 225-MW vertical Francis turbine-generator units. Electricity from the project will be exported to India via a 217-km-long 400-kV double circuit transmission line

Status
Prospective
Sector
Water Supply and Storage, Hydro, Oil and Gas, Tunnel, Wind, Power Transmission, Government, Forest Products and Packaging, Power Generation (CCGT), Commercial
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Arun-3 Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Arun-3 Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of hydroelectric utilities on the Arun River in the Sunkhuwashabha District of Nepal. The dam will be 70m tall and the headrace tunnel will be 11.7 km long. The underground powerhouse will contain four 225-MW vertical Francis turbine-generator units. Electricity from the project will be exported to India via a 217-km-long 400-kV double circuit transmission line. The capacity of the facility is 900 MW. Annually, the facility is expected to generate about 3,685 GWh and power from the project will be exported from Dhalkebar in Nepal, to Muzaffarpur in India. The project is being developed by SJVN through wholly owned subsidiary SJVN Arun-3 Power Development Company. SJVN - a joint venture between the federal government of India and the Himachal Pradesh state government - received the allocation to develop the project on a build-own-operate-transfer basis, for a period of 30 years, in March 2008. The power distribution agreement for the project, which provides 21.9% free power to Nepal for the 25-year concession period, was signed by Investment Board Nepal and SAPDC. The $841.9 million (Rs 6,333.40-crore) loan was arranged by a consortium of banks, which includes: State Bank of India, Punjab National Bank, Export-Import Bank of India, Canara Bank, Union Bank of India, Everest Bank Ltd and Nabil Bank. The plant was financed on a 100:0 debt-to-equity ratio. The project entered into construction stage on May 11, 2018 and the debt financing was signed on 22 February, 2022. Realfin https://himachaltonite.com/himachal/sjvns-arun-power-subsidiary-signs-inr-6333-crore-loan-agreement/ https://www.business-standard.com/article/companies/sjvn-signs-papers-to-get-rs-6-333-cr-loan-for-arun-3-hydro-project-in-nepal-122022201418_1.html https://www.hydroreview.com/business-finance/sjvn-signs-loan-agreement-to-advance-900-mw-arun-3-hydroelectric/#gref https://economictimes.indiatimes.com/news/politics-and-nation/modi-oli-jointly-lay-foundation-stone-of-900-mw-arun-iii-hydroelectric-power-plant/articleshow/64128226.cms

Original sector

Energy

Procurement method

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Oil and Gas, Tunnel, Wind, Power Transmission, Government, Forest Products and Packaging, Power Generation (CCGT), Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project