Arun-3 Hydroelectric Project
Sector: Power Generation (CCGT) • Location: Nepal
Source: The Tribune
The Arun-3 Hydroelectric Project is a 900 MW cross-border hydropower project being developed by SJVN in Nepal. The project involves construction of an underground powerhouse at Pukhuwa and a dam at Phaksinda, including major civil and electro-mechanical works under challenging Himalayan terrain.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Tribune
ConstructChat
Ask ConstructChat about Arun-3 Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arun-3 Hydroelectric Project is a 900 MW cross-border hydropower project being developed by SJVN in Nepal. The project involves construction of an underground powerhouse at Pukhuwa and a dam at Phaksinda, including major civil and electro-mechanical works under challenging Himalayan terrain. |
Original sector | Energy |
Location
Country | Nepal |
Source
Source | The Tribune |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
