ARUN III ACCESS RD
Sector: Road • Location: Nepal
Source: World Bank Group
The objectives of the Arun Access Road Project are to provide access to the Arun three hydroelectric construction site, strengthen the ability of the Government to provide assistance to families affected by the project, and reduce the cost of transporting goods between the agricultural (but food deficit) areas of the Koshi Hills and the more industrialized and productive Terai. To achieve these ob
- Status
- Closed
- Sector
- Road, Raw Materials, Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ARUN III ACCESS RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Arun Access Road Project are to provide access to the Arun three hydroelectric construction site, strengthen the ability of the Government to provide assistance to families affected by the project, and reduce the cost of transporting goods between the agricultural (but food deficit) areas of the Koshi Hills and the more industrialized and productive Terai. To achieve these objectives, the project comprises: (i) construction of a gravel surfaced road, from near the end of the existing road, to the Arun III construction site, including a six kilometer spur road to the administrative center of Chainpur; (ii) a road maintenance depot at Tumlingar to support maintenance of the project road and monitor maintenance operations carried out by contractors; (iii) rehabilitation of families adversely affected by the construction of the access road through implementation of a Land Acquisition, Compensation, and Rehabilitation Plan (ACRP); and (iv) consultancy services for construction supervision, training of maintenance personnel, and the preparation and implementation of the ACRP. |
Original sector | Transportation |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Nepal
- Kathmandu-Kulekhani-Hetauda Tunnel Highway
- Himal Power Limited
- Upgrades to Tripurasundari-Satbanjha road
- Upgrades to Shitalpati-Musikot road
- Improvement to Dolalghat -Chautara road
- Nepal: Road Network Development
- Dharan-Chatara-Gaighat-Hetauda Road Project
- Creation of all-weather road surface along Damak-Gauriganj road
