logo
ProjectUnder Construction

Arun III Hydropower Project

Sector: Power Generation (CCGT) • Location: Nepal

Source: Onlinekhabar English

The Arun III Hydropower Project, constructed with Indian assistance, is scheduled for inspection by Indian Minister Manohar Lal Khattar during his visit to Nepal.

Status
Under Construction
Sector
Power Generation (CCGT), Hydro
Location
Nepal
Updated
22 Jul 2026
Source
Onlinekhabar English

ConstructChat

Ask ConstructChat about Arun III Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Arun III Hydropower Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from Onlinekhabar English.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Arun III Hydropower Project, constructed with Indian assistance, is scheduled for inspection by Indian Minister Manohar Lal Khattar during his visit to Nepal.

Original sector

Energy

Location

Country

Nepal

Source

Source

Onlinekhabar English

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro

Article published date

2025-04-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project