logo

Arun Valley Piluwa Khola SHPP

Sector: Hydro • Location: Nepal

Source: World Bank Group

Project
Active

Arun Valley Hydro Power Development Company was planning the development of the 3MW Piluwa Khola run-of-river hydropower plant, near Sankhuwasabha District, Koshi Zone, Piluwa River, a tributary of Arun River.

The PPA was signed with NEA in 2000, to supply 19.56GWh annually. Construction started in March 2000 and was completed in August 2003. Commercial operation started on September 18th 2003.

Status
Prospective
Sector
Hydro, Metal, Wind, Power Generation (CCGT), Government, Commercial
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Arun Valley Piluwa Khola SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Arun Valley Piluwa Khola SHPP” is an infrastructure initiative in the Hydro sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Arun Valley Hydro Power Development Company was planning the development of the 3MW Piluwa Khola run-of-river hydropower plant, near Sankhuwasabha District, Koshi Zone, Piluwa River, a tributary of Arun River. The PPA was signed with NEA in 2000, to supply 19.56GWh annually. Construction started in March 2000 and was completed in August 2003. Commercial operation started on September 18th 2003. The project was connected to the grid via a 33kV transmission line. Equipment was supplied by Wasserkraft Volk AG, from Germany (Turgo impulse turbines).Civil work ws done by Marushin Shitaka Construction Company (Japan). Metal works was done by Machhapuchhere Metal and Machinery Works Company, Pokhara, Nepal. No further financial information about the project was available. The financial closure date was an estimate (completed construction, September 2003). The total cost was US$1.45 million per MW (US$4.35 million), or Nrs.326.4 million. The IRR of the project was reported as 22.8%. Financing was provided by: Bank of Kathmandu Limited (Lead), Nepal SBI Bank Limited (itself 55% owned by SBI Bank, India), Machhapuchchhre Bank Limited, Nepal Bank Limited. http://www.arunhydro.com.np/index.php?link=projects http://ridihydro.com.np/project/piluwakhola-hydropower-project/ http://nirmaljoshi.wordpress.com/2011/07/29/list-of-small-hydropower-project-in-nepal-2011/

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Metal, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project