logo
ProjectPlanned

Aruna Kolamb Pumped Storage Project

Sector: Power Generation (CCGT) • Location: Maharashtra, India

Source: Power Peak Digest

A 1,200 MW open loop pumped storage project in Kolhapur and Ratnagiri districts, Maharashtra, consisting of four units of 300 MW each, with 6.14 hours of daily generation and annual output of 2,556.37 million units. Estimated cost Rs 7,394.46 crore, requiring 383.09 hectares of land including forest land.

Status
Prospective
Sector
Power Generation (CCGT), Hydro
Location
Maharashtra, India
Updated
19 Nov 2026
Source
Power Peak Digest

ConstructChat

Ask ConstructChat about Aruna Kolamb Pumped Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Aruna Kolamb Pumped Storage Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maharashtra, India. Taiyo aggregates data on it from Power Peak Digest.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A 1,200 MW open loop pumped storage project in Kolhapur and Ratnagiri districts, Maharashtra, consisting of four units of 300 MW each, with 6.14 hours of daily generation and annual output of 2,556.37 million units. Estimated cost Rs 7,394.46 crore, requiring 383.09 hectares of land including forest land.

Original sector

Power

Budget

Location

Country

India

State

Maharashtra

Source

Source

Power Peak Digest

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro

Article published date

2026-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project