Asan River Bridge Project
One of 6,542 projects Taiyo tracks in Madhya Pradesh.
Source: India Investment Grid (IIG)
Information Water Resources Department, Government of Madhya Pradesh has come up with Asan River Bridge Project with a ticket size of 25.58 INR Crores. This project in Roads & Bridges sub-sector involves Construction of New Road/Bridge/Underpass/Tunnel The current status of the project is Tender Published and is being developed through the Turnkey route.
- Status
- Prospective
- Sector
- Bridge, Tunnel, Water Supply and Storage, Government, Road
- Location
- Morena, Madhya Pradesh, India
- Updated
- 19 Nov 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Asan River Bridge Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | tender publish |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Information Water Resources Department, Government of Madhya Pradesh has come up with Asan River Bridge Project with a ticket size of 25.58 INR Crores. This project in Roads & Bridges sub-sector involves Construction of New Road/Bridge/Underpass/Tunnel The current status of the project is Tender Published and is being developed through the Turnkey route. |
Original sector | Inland Waterways |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Morena |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Bridge, Tunnel, Water Supply and Storage, Government, Road |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
