ASB Still River Pedestrian Bridge Refurbishment
Sector: Cement • Location: Winsted, Connecticut, United States of America
Source: Dodge
Refurbishment of the existing pedestrian bridge, including minor repairs to the concrete sidewalk at the abutments, replacement of the existing wood decking with composite decking on the walking surface of the bridge. Removal of the west gate and the addition of a security gate at the west and east end of the existing bridge. Protection of the Still River from all construction activities
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Refurbishment of the existing pedestrian bridge, including minor repairs to the concrete sidewalk at the abutments, replacement of the existing wood decking with composite decking on the walking surface of the bridge. Removal of the west gate and the addition of a security gate at the west and east end of the existing bridge. Protection of the Still River from all construction activities |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
