ASCHACH POWER
Sector: Water Supply and Storage • Location: Austria
Source: World Bank Group
The Aschach Hydropower Project in Austria will assist in providing energy to meet the base load requirements in the system and to maintain an economic balance between hydro and thermal generation. The dam structure will have a total length of 496 meters and would consist of a weir section, a power house, two locks, and an operational building. The power house will be equipped with four generating
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Commercial, Government
- Location
- Austria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ASCHACH POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Aschach Hydropower Project in Austria will assist in providing energy to meet the base load requirements in the system and to maintain an economic balance between hydro and thermal generation. The dam structure will have a total length of 496 meters and would consist of a weir section, a power house, two locks, and an operational building. The power house will be equipped with four generating units with a total capacity of 264 kv. The four transformers will be located on a platform on the downstream side of the power house and connected with the switching station on the right bank by cables. A 34 kilometer double circuit 220 kv transmission line and a new switching station at Lambach will provide the connection between the Aschach plant and the Verbundgesellschaft (V.G.) network. This project will provide a substantial amount of energy to meet the base load requirements in the system and help to maintain an economic balance between hydro and thermal generation. Compared with an alternative thermal plant, the additional investment required for the hydro installation is justified. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Austria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
