logo

ASEA Aklan Biomass Plant

Active · Philippines

Source: World Bank Group

Project
Active

ASEA One Power Corporation (AOPC) developed the 12MW Aklan biomass plant, Bgry. Agbanawan, Banga, Aklan.

The tariff for the plant was P5.9/kWh. Local government endorsement was received in March 2010. The bidding for the EPC contract was conducted in September 2010, after previously being awarded to AREVA Bioenergy India which was denied due to too low pressure requirements. The project signed 54

Status
Prospective
Sector
Fertilizers, Consumer Products, Biomass, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ASEA Aklan Biomass Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ASEA Aklan Biomass Plant” is an infrastructure initiative in the Fertilizers sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ASEA One Power Corporation (AOPC) developed the 12MW Aklan biomass plant, Bgry. Agbanawan, Banga, Aklan. The tariff for the plant was P5.9/kWh. Local government endorsement was received in March 2010. The bidding for the EPC contract was conducted in September 2010, after previously being awarded to AREVA Bioenergy India which was denied due to too low pressure requirements. The project signed 54 supply contracts of rice with different millers in September 2010. The equity investor was identified in March 2011. The design contract was awarded to Dragon Power Clean Technology (China). The initial equity MOU with ASEA and LG International were signed in June 2011 - at that time negotiations with Dutch development bank FMO were also conducted over a US$10 million equity investment. The equity investors were confirmed in September 2011: LG International, FMO, and Boustead SALCON. The EPC contract was signed in April 2012 with Dragon Power Cleantech (China). Construction started in September 2012. Commissioning was expected for April 2014. Fuel supply was to consist of local sustainable agriculture rice crop residues, rice husk, rice straw, and woodchips. Output was expected to be sold to Aklan Electric Cooperative Inc under a 25 year PPA, starting in January 2013. The project reached financial closure in June 2012, with LBP (Land Bank of the Philippines). The debt/equity ratio was 70/30. Total project cost was unknown. The project received tax benefits from the government. http://www.renewableenergyfocus.com/view/26702/contract-signed-for-12mw-biomass-plant-in-philippines/ http://www.neda-rdc6.ph/site/rpmc6/on_PowGen_Biomass-ASEA.pdf http://www.neda-rdc6.ph/website/rpmc6/on_PowGen_Biomass-ASEA.pdf

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Fertilizers, Consumer Products, Biomass, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project