ASEA Aklan Biomass Plant
Active · Philippines
Source: World Bank Group
ASEA One Power Corporation (AOPC) developed the 12MW Aklan biomass plant, Bgry. Agbanawan, Banga, Aklan.
The tariff for the plant was P5.9/kWh. Local government endorsement was received in March 2010. The bidding for the EPC contract was conducted in September 2010, after previously being awarded to AREVA Bioenergy India which was denied due to too low pressure requirements. The project signed 54
- Status
- Prospective
- Sector
- Fertilizers, Consumer Products, Biomass, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ASEA Aklan Biomass Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ASEA One Power Corporation (AOPC) developed the 12MW Aklan biomass plant, Bgry. Agbanawan, Banga, Aklan. The tariff for the plant was P5.9/kWh. Local government endorsement was received in March 2010. The bidding for the EPC contract was conducted in September 2010, after previously being awarded to AREVA Bioenergy India which was denied due to too low pressure requirements. The project signed 54 supply contracts of rice with different millers in September 2010. The equity investor was identified in March 2011. The design contract was awarded to Dragon Power Clean Technology (China). The initial equity MOU with ASEA and LG International were signed in June 2011 - at that time negotiations with Dutch development bank FMO were also conducted over a US$10 million equity investment. The equity investors were confirmed in September 2011: LG International, FMO, and Boustead SALCON. The EPC contract was signed in April 2012 with Dragon Power Cleantech (China). Construction started in September 2012. Commissioning was expected for April 2014. Fuel supply was to consist of local sustainable agriculture rice crop residues, rice husk, rice straw, and woodchips. Output was expected to be sold to Aklan Electric Cooperative Inc under a 25 year PPA, starting in January 2013. The project reached financial closure in June 2012, with LBP (Land Bank of the Philippines). The debt/equity ratio was 70/30. Total project cost was unknown. The project received tax benefits from the government. http://www.renewableenergyfocus.com/view/26702/contract-signed-for-12mw-biomass-plant-in-philippines/ http://www.neda-rdc6.ph/site/rpmc6/on_PowGen_Biomass-ASEA.pdf http://www.neda-rdc6.ph/website/rpmc6/on_PowGen_Biomass-ASEA.pdf |
Original sector | Energy |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Consumer Products, Biomass, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Fertilizers projects in Philippines
- ASEA Aklan Biomass Plant
- Reina Mercedes Corn Processing Center
- Cebu Coal-fired Power Plant
- Study on Irrigation Management for Crop Diversification
- Study on Irrigation Management for Crop Diversification
- Study on Irrigation Management for Crop Diversification
- Study on Irrigation Management for Crop Diversification
- Study on Irrigation Management for Crop Diversification