ASEAN Wind Energy Capacity Expansion
Sector: Wind • Location: Bangkok, Multiple ASEAN countries
Source: T&D India
The project involves scaling up onshore wind energy capacity in ASEAN from 6.5 GW in 2024 to 26 GW by 2030, alongside developing a growing pipeline of offshore wind projects. It aims to support ASEAN's energy transition by reducing fossil fuel dependence and meeting increasing electricity demand through coordinated manufacturing, technology, and policy efforts.
- Status
- Prospective
- Sector
- Wind, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Bangkok, Indonesia
- Updated
- 22 Jul 2026
- Source
- T&D India
ConstructChat
Ask ConstructChat about ASEAN Wind Energy Capacity Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves scaling up onshore wind energy capacity in ASEAN from 6.5 GW in 2024 to 26 GW by 2030, alongside developing a growing pipeline of offshore wind projects. It aims to support ASEAN's energy transition by reducing fossil fuel dependence and meeting increasing electricity demand through coordinated manufacturing, technology, and policy efforts. |
Original sector | Renewable Energy |
Location
Country | Indonesia |
City | Bangkok |
Source
Source | T&D India |
URL |
More Details
Record type | Project |
Sector | Wind, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
