Ashlyn Apartments
Sector: Water Supply and Storage • Location: Elkins Park, Pennsylvania, United States of America
Source: Dodge
Total of 99 dwelling units; 8,394 sq. ft. of office space; 8,511 sq. ft. of commercial space; 8,911 sq. ft. of community amenity space; with 217 vehicle parking spaces including seven (7) EV charging stations; eleven(11) bicycle spaces, along with utility services, walkways, outdoor plaza, a gazebo and three (3) stormwater management systems, and a realigned entrance driveway that connects to Spri
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Electric Vehicles (EVs), Road, Automotive, Car parking, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT)
- Location
- Elkins Park, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ashlyn Apartments
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Total of 99 dwelling units; 8,394 sq. ft. of office space; 8,511 sq. ft. of commercial space; 8,911 sq. ft. of community amenity space; with 217 vehicle parking spaces including seven (7) EV charging stations; eleven(11) bicycle spaces, along with utility services, walkways, outdoor plaza, a gazebo and three (3) stormwater management systems, and a realigned entrance driveway that connects to Spring Avenue across Ashbourne Road |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Elkins Park |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Electric Vehicles (EVs), Road, Automotive, Car parking, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
