Asphalt and Utility Improvements - Dillon Drive
Closed · Colorado · Last reported Mar 2024
Source: Dodge USA
This project will consist of asphalt mill and overlay, crack repair and sanitary sewer large main removal and replacement on Dillon Drive from the north side of existing RR Bridge to the future roundabout of Eagleridge Boulevard and Dillon Drive.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Pueblo, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt and Utility Improvements - Dillon Drive
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will consist of asphalt mill and overlay, crack repair and sanitary sewer large main removal and replacement on Dillon Drive from the north side of existing RR Bridge to the future roundabout of Eagleridge Boulevard and Dillon Drive. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Pueblo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
