Asphalt Loading Area Improvements
Closed · Georgia · Last reported Sep 2024
Source: Dodge USA
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Asphalt Loading Area Improvements to serve Big Bend Agri-Services as shown on the construction drawings. In general, construction consists of deep base repair, heavy duty asphalt paving, and all associated measures for the complete project. Time allotted for completion of work is
- Status
- Closed
- Sector
- Road, Manufacturing (Industrial), Commercial
- Location
- Cairo, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt Loading Area Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Asphalt Loading Area Improvements to serve Big Bend Agri-Services as shown on the construction drawings. In general, construction consists of deep base repair, heavy duty asphalt paving, and all associated measures for the complete project. Time allotted for completion of work is 60 consecutive calendar days to substantial completion |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Cairo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
