logo

Asphalt Patching IQC

Sector: Power Transmission • Location: Gray, Georgia, United States of America

Source: Dodge USA

Project
Bid Results

The work to be performed, in general, consists of removing and replacing damaged sections of asphalt, and repairing sections of failed asphalt. Asphalt patches will be for various sizes due to utility repairs, crossings and base failures. The work shall include traffic control, saw cutting (as indicated necessary By JCBOC And indicated on the Service cut location sheet ), excavation, and removal o

Status
Closed
Sector
Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Gray, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Asphalt Patching IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Asphalt Patching IQC” is an infrastructure initiative in the Power Transmission sector, located in Gray, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be performed, in general, consists of removing and replacing damaged sections of asphalt, and repairing sections of failed asphalt. Asphalt patches will be for various sizes due to utility repairs, crossings and base failures. The work shall include traffic control, saw cutting (as indicated necessary By JCBOC And indicated on the Service cut location sheet ), excavation, and removal of existing debris. To provide guidance to the bidders in preparing their proposal, the type of wo...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Gray

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project