Asphalt Pavement REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
PROJECT DESCRIPTION Furnish and install approximately 2900 tons of WisDOT 4 LT 58-34 S Hot Mix Asphaltic Pavement on approximately 1.7 miles of Elbow Lake Rd.CTH W to Shuttleworth Rd. Includes intersection of Shuttleworth Rd. The pavement shall be 20 feet wide, 2.5 inch compacted thickness and a 2 cross slope. The contractor will be required to pass a proof roll of aggregate surface with owner pre
- Status
- Closed
- Sector
- Government, Road, Manufacturing (Industrial), Commercial
- Location
- Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Asphalt Pavement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROJECT DESCRIPTION Furnish and install approximately 2900 tons of WisDOT 4 LT 58-34 S Hot Mix Asphaltic Pavement on approximately 1.7 miles of Elbow Lake Rd.CTH W to Shuttleworth Rd. Includes intersection of Shuttleworth Rd. The pavement shall be 20 feet wide, 2.5 inch compacted thickness and a 2 cross slope. The contractor will be required to pass a proof roll of aggregate surface with owner present to assure parties of compaction |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
