Asphalt Pavement Replacement
Sector: Road • Location: Ben Lomond, California, United States of America
Source: Dodge USA
The 2.7-mile paving effort will extend from Lazy Woods Road in Felton to California Drive in Ben Lomond. It involves grinding off the top layer of existing asphalt pavement and replacing it with the same respective thickness of rubberized hot mix asphalt.
- Status
- Under Construction
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Ben Lomond, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2.7-mile paving effort will extend from Lazy Woods Road in Felton to California Drive in Ben Lomond. It involves grinding off the top layer of existing asphalt pavement and replacing it with the same respective thickness of rubberized hot mix asphalt. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ben Lomond |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
