Asphalt Plant No. 1 - Phase 2
Sector: Road • Location: Los Angeles, California, United States of America
Source: Dodge USA
Design and installation of enclosed canopy, staff office, RAP processing equipment such as impactor, screener, and utility connections to provide additional storage and transport space for the new Asphalt Plant No. 1, at a remote location at 25th Street and Harriet Street.
- Status
- Closed
- Sector
- Road, Commercial, Residential, Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt Plant No. 1 - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and installation of enclosed canopy, staff office, RAP processing equipment such as impactor, screener, and utility connections to provide additional storage and transport space for the new Asphalt Plant No. 1, at a remote location at 25th Street and Harriet Street. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Residential, Power Transmission, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
