Asphalt Rd Resurfacing Highways H19
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Rehabilitation consists of milling within existing asphalt to a depth of 40 mm, pavement repairs to 80 mm. Modified class 1 medium mix (70% of fines to be manufactured) using a Group A 80/100 AC. Asphalt Rd Resurfacing Highways: Central Island Parksville Area: H19 Superior Rd to Craigs Crossing (56 Lane Km)
- Status
- Under Construction
- Sector
- Road, Manufacturing (Industrial), Government, Commercial
- Location
- Chilliwack, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt Rd Resurfacing Highways H19
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitation consists of milling within existing asphalt to a depth of 40 mm, pavement repairs to 80 mm. Modified class 1 medium mix (70% of fines to be manufactured) using a Group A 80/100 AC. Asphalt Rd Resurfacing Highways: Central Island Parksville Area: H19 Superior Rd to Craigs Crossing (56 Lane Km) |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Chilliwack |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial), Government, Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
