Asphalt Road REBID
Sector: Water Supply and Storage • Location: Norrie, Wisconsin, United States of America
Source: Dodge USA
Grinding present asphalt, paving, and shouldering on Frederick Drive, between County Highway D and Mayflower Lane for a distance/width of 2,218 x 26 20 paved travel width for both lanes with 3 paved shoulders each side. Work to include: Bid 1 Pulverize present asphalt, fine grading, water, shape, and compact the base course material. Bid 2 Pave 20 width for both lanes with WisDOT Spec. Type 4MT 58
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial
- Location
- Norrie, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Asphalt Road REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Grinding present asphalt, paving, and shouldering on Frederick Drive, between County Highway D and Mayflower Lane for a distance/width of 2,218 x 26 20 paved travel width for both lanes with 3 paved shoulders each side. Work to include: Bid 1 Pulverize present asphalt, fine grading, water, shape, and compact the base course material. Bid 2 Pave 20 width for both lanes with WisDOT Spec. Type 4MT 58-28S asphalt mix compacted to an average thickness of 3 inches in two lifts. Apply tack coat prio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Norrie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
