logo

Asphaltic Concrete Pavement Milling & Resurfacing

Sector: Cement • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Active/Bid & Award

The intent of this annual contract is to have a contracting mechanism to complete repairs at locations where water main or sewer rehabilitation work has disturbed the existing pavement. Milling is widely used for pavement recycling whereby the pavement is removed and ground up to be used as the aggregate in new pavement. For asphalt surfaces the product of milling is reclaimed asphalt pavement, wh

Project Information FAQ

Project Information

5 Q
The project “Asphaltic Concrete Pavement Milling & Resurfacing” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active/bid & award

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The intent of this annual contract is to have a contracting mechanism to complete repairs at locations where water main or sewer rehabilitation work has disturbed the existing pavement. Milling is widely used for pavement recycling whereby the pavement is removed and ground up to be used as the aggregate in new pavement. For asphalt surfaces the product of milling is reclaimed asphalt pavement, which can be recycled in the asphalt hot mix pavement by combining with new aggregate and asphalt binder or a recycling agent. This reduces the impact that resurfacing has on the environment. Milling can also remove distresses from the surface, providing a better driving experience and/or longer roadway life. It can be also be used to control or change the height of part or the entire roadway. In addition to modifying a road profile, milling also allows the road to be resurfaced without change to the profile and thus no change to the drainage characteristics of the roadway such as would occur with a reduced gutter spread from an additional 2″ overlay without milling the existing surface. The scope of this project includes: Concrete pavement milling and resurfacing of approved roadway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data