ASPIRE Summer EV Academy
One of 10,000+ projects Taiyo tracks in Utah.
Source: Utah State University
A hands-on, five-day STEM workshop where selected high school students in Northern Utah build a real electric vehicle. The program introduces students to electric vehicle systems, including electrical wiring, battery components, and vehicle functionality, using a street-legal vehicle platform developed by Switch Vehicles Inc.
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Energy Storage, Education, Automotive, Road
- Location
- North Logan, Utah, United States of America
- Updated
- 19 Nov 2026
- Source
- Utah State University
ConstructChat
Ask ConstructChat about ASPIRE Summer EV Academy
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A hands-on, five-day STEM workshop where selected high school students in Northern Utah build a real electric vehicle. The program introduces students to electric vehicle systems, including electrical wiring, battery components, and vehicle functionality, using a street-legal vehicle platform developed by Switch Vehicles Inc. |
Original sector | Education |
Location
Country | United States of America (USA) |
State | Utah |
City | North Logan |
Source
Source | Utah State University |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Energy Storage, Education, Automotive, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States
- New Orleans BioInnovation Center
- MSU Grand Rapids Research Centre, Michigan, USA
- Silver Line Gateway Project, Massachusetts
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Upsher-Smiths’ Pharmaceutical Manufacturing Facility, Minnesota, USA
- Annual Meeting of Stockholders
- HVIP Deadline Approaching: Don’t Miss Out on Incentives for Your Zero-Emission Fleet Before 2025
- Xos DC Fast Chargers
