Assam Resilient Rural Bridges Program

Sector: Mass Transit • Location: India

Source: World Bank Group

Project
Active

The PforR Program’s boundary is restricted to improving bridges on the rural roads network – “rural bridges”. The Program interventions include: (a) maintenance; (b) widening single lane bridges; (c) replacement of temporary, distressed and collapsed/washed out bridges, and construction of new bridges; and (d) updating Electric Vehicle Policy to enhance rural e- mobility & establishing Green Rural

Status
Prospective
Sector
Mass Transit, Road, Bridge, Warehouse, Electric Vehicles (EVs), Consumer Products, Commercial, Government, Automotive
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Assam Resilient Rural Bridges Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Assam Resilient Rural Bridges Program” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The PforR Program’s boundary is restricted to improving bridges on the rural roads network – “rural bridges”. The Program interventions include: (a) maintenance; (b) widening single lane bridges; (c) replacement of temporary, distressed and collapsed/washed out bridges, and construction of new bridges; and (d) updating Electric Vehicle Policy to enhance rural e- mobility & establishing Green Rural Freight and Public Transportation Hubs along the rural roads network. The Program supports extensive resilience and institutional building initiatives with four process DLIs, including (e) enhancing resilience of bridges; (f) strengthening Environmental and Social management capability; (g) strengthening APWRD’s financial and procurement capability; and (h) strengthening roads and bridges management capability. IPF Component (TA Component) includes:a) Prepare Program rural bridges investment and manage Program implementation, including Detail Project Report (DPR), Construction Supervision Consultants (CSC), Transport hub design, GRS, Gender Action Plan, and E&S impact managementb) Program management support, studies, and system upgrading including Independent Verification Agent, Program Management Consultant, Technical Audit Consultant, Individual Consultants, Impact evaluation, training, road financing strategy, systems upgrading/development, studies; and administrative, legal, and operating expenses.c) Strengthen the Assam Road Research and Training Institute (ARRTI) - center of excellence-, including training material development, delivering induction training and short-term courses, and research. This TA component is designed to achieve Disbursement Linked Indicator (DLI) #1 and the Program Action Plan (PAP) on environment and social risk management included in the PforR Operation. This is to address the gaps identified by the Environmental and Social Systems Assessment (ESSA) undertaken to assess the country systems and capacity of Institutions to effectively manage E&S risks. The DLI #1 covers:(i) Adoption of Resettlement Policy Framework (RPF) and Environmental and Social Policy - Indigenous People Policy (ESP-IPP) that aligns with country laws and good international industry practices (GIIP) [The ESP-IPP and RPF including improved systems and procedures supported by the PforR will subsequently apply to the whole of government’s program. The ESP-IPP/RPF will include the screening criteria to avoid financing of any High E&S risk subprojects under Bank’s Program]; (ii) Setting up of a dedicated E&S management unit that will report to planning and finance wings of the APWRD; and (iii) Establishment of digital system to track compliance of the policies on real time basis. The DLI#1 is incentivized with a total sum of US$ 4.8 million (Scalable).The PAP is designed to ensure that civil works are initiated only after the client provides encumbrance free land in accordance with the ESP-IPP and RPF to the contractors before the commencement of the works. Both the DLI and PAP will be adopted sector wide by the Department. The Verification Agency will be expected to follow the verification protocol to the compliance of the PAP and the DLI. The TA component will support the (i) preparation of sub-project level ESIAs/ESMPs in accordance with the APWRD’s ESP-IPP that aligns with the national/state legal policy requirements and international standards, including the World Bank’s Environmental and Social Framework (ESF) supported by PforR; (ii) set up the Grievance Management Systems; (iii) develop and implement the capacity building program of APWRD by the ESMU; (iv) prepare the Gender Action Plan; (v) implement the systems for evidence based monitoring for evidence based reporting supported under the PforR.

Original sector

FY17 - Social Protection,FY17 - Transportation

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Bridge, Warehouse, Electric Vehicles (EVs), Consumer Products, Commercial, Government, Automotive

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project