Assembly Building
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge
Level Iii Alterations To Include Interior And Rear Additions And Complete Change Of Occupancy To Create An Assembly & Entertainment Use Within An Existing Five (5) Story Building As Per Approved Plans And Bbs Variance No. Mi-2024-003475. Building To Be Fully Sprinklered Per Nfpa 13 And Include Standpipes Per Nfpa 14. See Also Permit Sp-2025-000606 For Associated Excavation Work.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Assembly Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Level Iii Alterations To Include Interior And Rear Additions And Complete Change Of Occupancy To Create An Assembly & Entertainment Use Within An Existing Five (5) Story Building As Per Approved Plans And Bbs Variance No. Mi-2024-003475. Building To Be Fully Sprinklered Per Nfpa 13 And Include Standpipes Per Nfpa 14. See Also Permit Sp-2025-000606 For Associated Excavation Work. *2018 Iebc Review* **separate Permits Required For Mep & Fire Suppression Work** | Number Of Stories Above Grade: 5... |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
