Assessment of flood protection potentials in the Sajó Valley by means of remote sensing
Sector: Commercial • Location: Hungary
Source: Keep.EU
Our overall purpose is increase safety in the settlements endangered by flooding in May Juny of 2010 and to improve of their surroundings and to reduce the risk of flooding or other water damages, to provide water quality and to prevent other natural cases of damage. The program contribute to achieving the specific goals of section 4. ( Protecting our natural value) Our specific purposes:
- th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Our overall purpose is increase safety in the settlements endangered by flooding in May Juny of 2010 and to improve of their surroundings and to reduce the risk of flooding or other water damages, to provide water quality and to prevent other natural cases of damage. The program contribute to achieving the specific goals of section 4. ( Protecting our natural value) Our specific purposes: - the partners can harmonise their water building activities in the common 3 catchment areas in 10 Slovak and 34 Hungarian settlements. They harmonise their activities the needed plans and studies and to have authorized plans for the start of development. - To have a close relationship and cooperation between the operators of water and at the level of municipalities, and other authorities with the water authorities in the two countries which had to face with the disaster in May Juny of 2010. in the catchment area of the river Ipoly because of the extraordinary weather - To avoid the negative ecological or economic effects of flooding or inland inundation with the authorised permits and plans which are the results of our project - To build up an operable cooperation network. Set up a common project management and write common action plans and venture strategies - To connect the results of our projects to those plans, permits and project which were made for the whole watershed area of the river Ipoly. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
