Aswan High Dam
The status, timeline and source of this project. A free account opens every field.
Source: World Atlas
A massive embankment dam on the Nile River in Egypt completed in July 1970 and inaugurated in January 1971. It holds back Lake Nasser and generates about 2.1 gigawatts of installed capacity, enabling year-round irrigation and doubling arable land area.
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Atlas
ConstructChat
Ask ConstructChat about Aswan High Dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A massive embankment dam on the Nile River in Egypt completed in July 1970 and inaugurated in January 1971. It holds back Lake Nasser and generates about 2.1 gigawatts of installed capacity, enabling year-round irrigation and doubling arable land area. |
Original sector | Water Engineering |
Location
Country | Egypt |
Source
Source | World Atlas |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage |
Article published date | 2026-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
