ATCO Brine and Sedimentation Ponds and Pump Houses
Sector: Cement • Location: Canada
Source: Bird Construction
Nason, a subsidiary of Bird, completed two projects for Strathcona Storage Limited Partnership and its majority partner, ATCO Energy Solutions, at their salt cavern site just east of Fort Saskatchewan, Alberta — a brine pond and associated pump house, as well as a sedimentation pond and pump house. The brine pond contains the salt water that is extracted from the salt caverns to make way for the h
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Nason, a subsidiary of Bird, completed two projects for Strathcona Storage Limited Partnership and its majority partner, ATCO Energy Solutions, at their salt cavern site just east of Fort Saskatchewan, Alberta — a brine pond and associated pump house, as well as a sedimentation pond and pump house. The brine pond contains the salt water that is extracted from the salt caverns to make way for the hydrocarbon storage. The pond is designed to hold approximately 606,000 m3 of brine and is lined with a multi-layer HDPE membrane. Pumping brine to and from the cavern, the pump house contains three vertical turbine pumps that are capable of transporting approximately 340 m3 of product per hour. The sedimentation pond scope of work included the construction of one pond with two operating cells (each cell is 15,000 m3 usable volume for a total of 30,000 m3 in the pond) and a pump house to remove water runoff, facilitate primary water treatment and then pump the water to the various oil and gas facilities in the area for use as process water. Nason self-performed the concrete pump house structure, the pipe fabrication, pipe installation, and electrical and instrumentation scope. Both projects were completed with tight schedules to meet the summer 2016 completion date. Schedule constraints resulted in continuous shifts to complete the pump house construction on time. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
