logo

ATE II Transmissora de Energia

Sector: Commercial • Location: Isle of Wight, Brazil

Source: World Bank Group

Project
Active

In November 2004, ANEEL, Brazil’s federal electricity regulator, awarded a 30 year contract to ATE II Transmissora de Energia SA to build, maintain, and operate a new 922 km transmission line connecting the northern and northeastern regions of Brazil. The line was designed to run from the Colinas substation in the state of Tocantins to the Sobradinho substation in the state of Bahia passing throug

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT)
Location
Isle of Wight, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ATE II Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ATE II Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Isle of Wight, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2004, ANEEL, Brazil’s federal electricity regulator, awarded a 30 year contract to ATE II Transmissora de Energia SA to build, maintain, and operate a new 922 km transmission line connecting the northern and northeastern regions of Brazil. The line was designed to run from the Colinas substation in the state of Tocantins to the Sobradinho substation in the state of Bahia passing through the states of Maranhao and Piaui. According to the IDB, the project was vital in linking regions with surplus generation to regions with energy deficits. ANEEL awarded to the contract through a competitive tender to the consortium that paid the highest price to the government. Fourteen bidders were present, but Transmissora de Energia SA presented the winning offer of 107.57 mln Brazilian reais ($39 mln/29.91 mln euro). ATE II Transmissora de Energia SA was a special purpose company created by the Spanish engineering firm Abengoa to manage the project. Abengoa owned 100% of the project company. The total project cost was estimated at US $440.6 million. Construction began in 2005, but financial closure was reached in June 2006 with the approval of US $119.5 million loan from the Inter-American Development Bank (IDB). US $11.8 million of the IDB loan was granted as a complimentary line of credit. Accompanying this loan was debt financing from the Brazilian development bank BNDES and co-lenders for a total project debt financing of approximately US $280 million. The remainder was to be financed through equity.

Original sector

Energy

Budget

Location

Country

Brazil

State

Isle of Wight

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project