ATE IV - Sao Mateus Transmissora de Energia
Sector: Commercial • Location: Brazil
Source: World Bank Group
In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; COPEL TRANSMISSAO S.A.; ISA - INTERCONEXION ELECTRICA S.A. E.S.P.; and CONSORCIO CABURE. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa presented the lowest offer, a total value of US$ 5.3 million (BRL 11.5 million), 42.35% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsors created the company ATE IV - São Mateus Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 78.2 million (BRL 156.4 million) in the transmission line. Financial closure was achieved in December 2009, when the sponsor was granted a US $ 40 million (BRL 80.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |