ATE IV - Sao Mateus Transmissora de Energia

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ATE IV - Sao Mateus Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ATE IV - Sao Mateus Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; COPEL TRANSMISSAO S.A.; ISA - INTERCONEXION ELECTRICA S.A. E.S.P.; and CONSORCIO CABURE. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa presented the lowest offer, a total value of US$ 5.3 million (BRL 11.5 million), 42.35% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsors created the company ATE IV - São Mateus Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 78.2 million (BRL 156.4 million) in the transmission line. Financial closure was achieved in December 2009, when the sponsor was granted a US $ 40 million (BRL 80.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project