ATE IV - Sao Mateus Transmissora de Energia
Sector: Commercial • Location: Brazil
Source: World Bank Group
In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ATE IV - Sao Mateus Transmissora de Energia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; COPEL TRANSMISSAO S.A.; ISA - INTERCONEXION ELECTRICA S.A. E.S.P.; and CONSORCIO CABURE. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa presented the lowest offer, a total value of US$ 5.3 million (BRL 11.5 million), 42.35% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsors created the company ATE IV - São Mateus Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 78.2 million (BRL 156.4 million) in the transmission line. Financial closure was achieved in December 2009, when the sponsor was granted a US $ 40 million (BRL 80.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
