In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A

Project Information FAQ

Project Information

5 Q
The project “ATE IV - Sao Mateus Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2006, Abengoa S.A. was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 85 km transmission line located in the states of Parana and Santa Catarina (Bateias-Curitiba and Canoinhas-Sao Mateus). Besides Abengoa S.A., four other companies took part in the contest: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; COPEL TRANSMISSAO S.A.; ISA - INTERCONEXION ELECTRICA S.A. E.S.P.; and CONSORCIO CABURE. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa presented the lowest offer, a total value of US$ 5.3 million (BRL 11.5 million), 42.35% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsors created the company ATE IV - São Mateus Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 78.2 million (BRL 156.4 million) in the transmission line. Financial closure was achieved in December 2009, when the sponsor was granted a US $ 40 million (BRL 80.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data