logo

ATE Transmissora de Energia

Sector: Commercial • Location: Kent, Brazil

Source: World Bank Group

Project
Active

In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Parana and Sao Paolo states to Abenasa Transmissao de Energia Ltda. The company was to transmit power through the concession period of 30 years. The 370 km line would connect Londrina (Parana state) to Assis (Sao Paolo). The project, signed by concession agreement

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Kent, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ATE Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ATE Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Kent, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Parana and Sao Paolo states to Abenasa Transmissao de Energia Ltda. The company was to transmit power through the concession period of 30 years. The 370 km line would connect Londrina (Parana state) to Assis (Sao Paolo). The project, signed by concession agreement in February 2004, was one of seven transmission concessions awarded by Aneel in 2003-2004. All lines covered 1,787 km and included investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for seven groups of transmission concessions. Abenasa Transmissao de Energia Ltda comprised Abengoa SA and its Brazilian subsidiary. It was selected on the basis of offering the lowest transmission tariff. Total project cost was US$211 million. BNDES provided US$95 million project financing in March 2005. The project was expected to start operations in late 2006, but became operational in October 2005.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

State

Kent

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project