ATE Transmissora de Energia
Sector: Commercial • Location: Kent, Brazil
Source: World Bank Group
In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Parana and Sao Paolo states to Abenasa Transmissao de Energia Ltda. The company was to transmit power through the concession period of 30 years. The 370 km line would connect Londrina (Parana state) to Assis (Sao Paolo). The project, signed by concession agreement
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Kent, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ATE Transmissora de Energia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2003, the Brazilian power regulator Aneel awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s Parana and Sao Paolo states to Abenasa Transmissao de Energia Ltda. The company was to transmit power through the concession period of 30 years. The 370 km line would connect Londrina (Parana state) to Assis (Sao Paolo). The project, signed by concession agreement in February 2004, was one of seven transmission concessions awarded by Aneel in 2003-2004. All lines covered 1,787 km and included investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for seven groups of transmission concessions. Abenasa Transmissao de Energia Ltda comprised Abengoa SA and its Brazilian subsidiary. It was selected on the basis of offering the lowest transmission tariff. Total project cost was US$211 million. BNDES provided US$95 million project financing in March 2005. The project was expected to start operations in late 2006, but became operational in October 2005. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
State | Kent |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
