In May 2007, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 132 km transmission line ( Londrina – Maringa and Jagaraiva – Itarare II) located in the states of Paraná and São Paulo. Besides Abengoa S.A., nine other companies took part in the contest.

The bidding criteria set by ANEEL was the lowest requ

Project Information FAQ

Project Information

5 Q
The project “ATE V - Londrina Transmissora de Energia S.A.” is an infrastructure initiative in the Commercial sector, located in Parana, Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2007, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 132 km transmission line ( Londrina – Maringa and Jagaraiva – Itarare II) located in the states of Paraná and São Paulo. Besides Abengoa S.A., nine other companies took part in the contest. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa S.A presented the lowest offer, a total value of US$ 4.9 million (BRL 9.8 million), 42.18% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsor created the company ATE V - Londrina Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 63.6 million (BRL 127.13 million) in the transmission line. The construction works commenced in May 2009, but financial closure was only achieved in October 2009, when the sponsor was granted a US $ 34.6 million (BRL 69.3 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The section Londrina-Maringa commenced operations in November 2009, while the second section was under construction, as of December 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data