ATE V - Londrina Transmissora de Energia S.A.

Active · Brazil

Source: World Bank Group

Project
Active

In May 2007, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 132 km transmission line ( Londrina – Maringa and Jagaraiva – Itarare II) located in the states of Paraná and São Paulo. Besides Abengoa S.A., nine other companies took part in the contest.

The bidding criteria set by ANEEL was the lowest requ

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ATE V - Londrina Transmissora de Energia S.A.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ATE V - Londrina Transmissora de Energia S.A.” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2007, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 132 km transmission line ( Londrina – Maringa and Jagaraiva – Itarare II) located in the states of Paraná and São Paulo. Besides Abengoa S.A., nine other companies took part in the contest. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa S.A presented the lowest offer, a total value of US$ 4.9 million (BRL 9.8 million), 42.18% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsor created the company ATE V - Londrina Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 63.6 million (BRL 127.13 million) in the transmission line. The construction works commenced in May 2009, but financial closure was only achieved in October 2009, when the sponsor was granted a US $ 34.6 million (BRL 69.3 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The section Londrina-Maringa commenced operations in November 2009, while the second section was under construction, as of December 2009.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project