ATE VI - Campos Novos Transmissora de Energia S.A.
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
In December 2006, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 131 km transmission line (Dona Francisca - Santa Maria 3 and Campos Novos - Videira) located in the states of Rio Grande do Sul and Santa Catarina. Besides Abengoa, two other bidders took part in the contest: CONSORCIO VITORIA (Cia Técnica d
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In December 2006, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 131 km transmission line (Dona Francisca - Santa Maria 3 and Campos Novos - Videira) located in the states of Rio Grande do Sul and Santa Catarina. Besides Abengoa, two other bidders took part in the contest: CONSORCIO VITORIA (Cia Técnica de Engenharia Elétrica (Brasil)– 51% - líder; Eletrosul Centrais Elétricas S/A (Brasil) – 49%) and the Colombian company ISA - INTERCONEXIÓN ELÉCTRICA S.A. E.S.P. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa S.A presented the lowest offer, a total value of US$ 5.4 million (BRL 10.7 million), 24.11% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsor created the company ATE VI - Campos Novos Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 58.6 million (BRL 117.2 million) in the transmission line. The construction works commenced in May 2009, but financial closure was only achieved in November 2009, when the sponsor was granted a US $ 39.6 (BRL 79.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The section Campos Novos-Videira commenced operations in August 2009, while the section Dona Francisca-Santa Maria 3 was still under construction, as of December 2009. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |