ATE VI - Campos Novos Transmissora de Energia S.A.
Active · Brazil
Source: World Bank Group
In December 2006, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 131 km transmission line (Dona Francisca - Santa Maria 3 and Campos Novos - Videira) located in the states of Rio Grande do Sul and Santa Catarina. Besides Abengoa, two other bidders took part in the contest: CONSORCIO VITORIA (Cia Técnica d
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ATE VI - Campos Novos Transmissora de Energia S.A.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2006, Abengoa was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 131 km transmission line (Dona Francisca - Santa Maria 3 and Campos Novos - Videira) located in the states of Rio Grande do Sul and Santa Catarina. Besides Abengoa, two other bidders took part in the contest: CONSORCIO VITORIA (Cia Técnica de Engenharia Elétrica (Brasil)– 51% - líder; Eletrosul Centrais Elétricas S/A (Brasil) – 49%) and the Colombian company ISA - INTERCONEXIÓN ELÉCTRICA S.A. E.S.P. The bidding criteria set by ANEEL was the lowest required annual revenue. Abengoa S.A presented the lowest offer, a total value of US$ 5.4 million (BRL 10.7 million), 24.11% below the ceiling set by the regulatory agency. The contract was signed in June 2007, and the sponsor created the company ATE VI - Campos Novos Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 58.6 million (BRL 117.2 million) in the transmission line. The construction works commenced in May 2009, but financial closure was only achieved in November 2009, when the sponsor was granted a US $ 39.6 (BRL 79.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The section Campos Novos-Videira commenced operations in August 2009, while the section Dona Francisca-Santa Maria 3 was still under construction, as of December 2009. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia