In December 2010, the Spanish company Abengoa Concessoes Brasil Holding S.A. was awarded in a competitive bidding process the contract to build and operate 108-km connecting Itacaiunas-Carajas, located at the state of Para.
Besides Abengoa Concessoes , two other companies took part in the bidding process: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; and ELETRONORTE - CENTRAIS ELETRICA
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ATE VIII Transmissora de Energia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2010, the Spanish company Abengoa Concessoes Brasil Holding S.A. was awarded in a competitive bidding process the contract to build and operate 108-km connecting Itacaiunas-Carajas, located at the state of Para. Besides Abengoa Concessoes , two other companies took part in the bidding process: CME - CONSTRUCAO E MANUTENCAO ELECTROMECANICA S.A.; and ELETRONORTE - CENTRAIS ELETRICAS DO NORTE DO BRASIL S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Abengoa presented the lowest offer, a total value of US$ 2.7 million (BRL 4.9 million), 11.85 % below the ceiling set by the regulatory agency. The contract was signed in June 2011, and the sponsors created the company ATE VIII Transmissora de Energia S.A. In July 2012, Abengoa Brasil transferred 50% of its shares in ATE VIII Transmissora to Empresa Brasileira de Desenvolvimento e Participacoes Ltda. The sponsor committed to invest US$ 20.5 million (BRL 48.3 million) in the transmission line. Environmental clearance was awarded in March 2012, and the construction works commenced in late 2012. Commercial operation began in January 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project