Ateliers Versailles / minuit architectes
Sector: Steel
Source: ArchDaily
To address the various challenges, the project reorganized all the networks, incorporating lighting and furniture, both fixed and mobile. This was accompanied by a clean and simple renovation of the historic shell. The project covers a surface of 1500 m² and is composed of three large workshops with distinct geometries.The furniture, custom-designed, is assembled mechanically from standardized ele
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | To address the various challenges, the project reorganized all the networks, incorporating lighting and furniture, both fixed and mobile. This was accompanied by a clean and simple renovation of the historic shell. The project covers a surface of 1500 m² and is composed of three large workshops with distinct geometries.The furniture, custom-designed, is assembled mechanically from standardized elements, and modified as little as possible. The attachment systems to the existing structures were designed to efficiently free up and clear the spaces, which are often cluttered during project submissions. Raw materials, such as galvanized steel and recycled plastic, are used to resonate with the history of the site. The restoration of the stones and plaster, over 300 years old, creates a dialogue between the historical architecture and the new intervention.Text description provided by the architects.Facing the Château deVersailles, in the former King's Stables, the National School of Architecture of Versailles welcomes more than 1200 students each year. Due to changes in teaching methods and the deteriorating condition of the premises, the administration decided to carry out a complete renovation of part of the school: its workshops. The site, partially occupied and heritage-listed, required a fast intervention, which led the design process towards a synthetic approach.The renovation takes advantage of each space's specific features to offer a variety of work and learning environments (group work, individual work, computer use, model making, etc.), while also encouraging interaction between students. Two of the spaces, due to their unique configuration, are more suited for solitary work or model making, while the third workshop, with its simple layout, allows for a variety of configurations thanks to its mobile tables and suspended networks (exhibitions, presentations, etc.). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
