logo

Athi River II Medium Speed Diesel (MSD) Power Plant

Sector: Oil and Gas • Location: Kenya

Source: World Bank Group

Project
Active

The BOO project involves the development of the 80MW GEL (Gulf Energy Ltd.) Heavy Fuel Oil-Fired Power Plant in Kenya. The plant is to be located at Athi River on Mombasa Road, about 25KM from Nairobi City. It also includes a 66kV interconnector and backup metering equipment in the Mombasa Road area of Nairobi.

Total estimated cost is US$95.5 million and the SPV of the project is Gulf Power Limit

Project Information FAQ

Project Information

5 Q
The project “Athi River II Medium Speed Diesel (MSD) Power Plant” is an infrastructure initiative in the Oil and Gas sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The BOO project involves the development of the 80MW GEL (Gulf Energy Ltd.) Heavy Fuel Oil-Fired Power Plant in Kenya. The plant is to be located at Athi River on Mombasa Road, about 25KM from Nairobi City. It also includes a 66kV interconnector and backup metering equipment in the Mombasa Road area of Nairobi. Total estimated cost is US$95.5 million and the SPV of the project is Gulf Power Limited, composed of Gulf Energy (50%) and Multiple Hauliers (50%). Debt-to-equity ratio is 80:20 and the US$81 million debt was financed in four tranches: 1) A loan of US$22 million by IFC, 2) Multilateral loan of US$5 million by IFC, 3) Multilateral loan of US$27 million from OPEC Fund for International Development, and 4) term loan of US$27 million by Standard Bank. The loan agreement was signed in July 2014 and the project reached financial closure. Company: Multiple Hauliers Percentage: 50.00000% http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/SPI_DP29418 Company: Gulf Energy Percentage: 50.00000%

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data