Athi River II Medium Speed Diesel (MSD) Power Plant
Sector: Oil and Gas • Location: Kenya
Source: World Bank Group
The BOO project involves the development of the 80MW GEL (Gulf Energy Ltd.) Heavy Fuel Oil-Fired Power Plant in Kenya. The plant is to be located at Athi River on Mombasa Road, about 25KM from Nairobi City. It also includes a 66kV interconnector and backup metering equipment in the Mombasa Road area of Nairobi.
Total estimated cost is US$95.5 million and the SPV of the project is Gulf Power Limit
- Status
- Prospective
- Sector
- Oil and Gas, Power Generation (CCGT), Road, Commercial, Warehouse, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Athi River II Medium Speed Diesel (MSD) Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The BOO project involves the development of the 80MW GEL (Gulf Energy Ltd.) Heavy Fuel Oil-Fired Power Plant in Kenya. The plant is to be located at Athi River on Mombasa Road, about 25KM from Nairobi City. It also includes a 66kV interconnector and backup metering equipment in the Mombasa Road area of Nairobi. Total estimated cost is US$95.5 million and the SPV of the project is Gulf Power Limited, composed of Gulf Energy (50%) and Multiple Hauliers (50%). Debt-to-equity ratio is 80:20 and the US$81 million debt was financed in four tranches: 1) A loan of US$22 million by IFC, 2) Multilateral loan of US$5 million by IFC, 3) Multilateral loan of US$27 million from OPEC Fund for International Development, and 4) term loan of US$27 million by Standard Bank. The loan agreement was signed in July 2014 and the project reached financial closure. Company: Multiple Hauliers Percentage: 50.00000% http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/SPI_DP29418 Company: Gulf Energy Percentage: 50.00000% |
Original sector | Energy |
Budget |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Generation (CCGT), Road, Commercial, Warehouse, Government |
Article published date | 2024-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
