Athletic Field Improvements
Sector: Manufacturing (Industrial) • Location: Windsor, Connecticut, United States of America
Source: Dodge USA
The synthetic turf surface at O'Brien Field was installed in 2014. The life expectancy for artificial turf ranges from 8-10 years. This project includes improvements at O'Brien Field including the replacement of the artificial turf and drainage improvements. The Town of Windsor may be seeking a consultant to prepare a Athletic Field Improvements Design
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Government, Waste Processing and Treatment
- Location
- Windsor, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Athletic Field Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The synthetic turf surface at O'Brien Field was installed in 2014. The life expectancy for artificial turf ranges from 8-10 years. This project includes improvements at O'Brien Field including the replacement of the artificial turf and drainage improvements. The Town of Windsor may be seeking a consultant to prepare a Athletic Field Improvements Design |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Windsor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
