Athletic Turf Field Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project consists of but not limited to: including installation of sediment & erosion controls; curbing; fencing; cement concrete pavement; bituminous concrete pavement; drainage; earthwork; artificial turf field; electrical work; lighting; irrigation; site restoration and landscaping.
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Automotive, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Springfield, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Athletic Turf Field Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of but not limited to: including installation of sediment & erosion controls; curbing; fencing; cement concrete pavement; bituminous concrete pavement; drainage; earthwork; artificial turf field; electrical work; lighting; irrigation; site restoration and landscaping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Springfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Automotive, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
