Atlanta Gold Mine Project Phase 4 Drill Program
Under construction · Nevada · Last reported Apr 2026
Source: The Globe and Mail
Nevada King Gold Corp. is conducting exploration and permitting activities at its 100% owned 130 km2 Atlanta Gold Mine Project in eastern Nevada. The company has doubled its Phase 4 drill program to 40,000 metres and provided assay results from the Silver Park area, along with a project-wide permitting update.
- Status
- Under Construction
- Sector
- Mining
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about Atlanta Gold Mine Project Phase 4 Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nevada King Gold Corp. is conducting exploration and permitting activities at its 100% owned 130 km2 Atlanta Gold Mine Project in eastern Nevada. The company has doubled its Phase 4 drill program to 40,000 metres and provided assay results from the Silver Park area, along with a project-wide permitting update. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
