Atlantis Drill Center 1 Expansion Project
Sector: Oil and Gas • Location: New Orleans, United States of America
Source: Offshore Technology
The Atlantis Drill Center 1 expansion project in the Gulf of Mexico is an offshore oil and gas development that adds two wells to the existing drill center, expanding the Atlantis field's production capacity. The project includes a subsea tieback linking new wells to existing offshore production facilities via pipelines, enhancing the Atlantis platform's output by around 15,000 barrels of oil equi
- Status
- Closed
- Sector
- Oil and Gas
- Location
- New Orleans, United States of America
- Updated
- 22 Jul 2026
- Source
- Offshore Technology
ConstructChat
Ask ConstructChat about Atlantis Drill Center 1 Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Atlantis Drill Center 1 expansion project in the Gulf of Mexico is an offshore oil and gas development that adds two wells to the existing drill center, expanding the Atlantis field's production capacity. The project includes a subsea tieback linking new wells to existing offshore production facilities via pipelines, enhancing the Atlantis platform's output by around 15,000 barrels of oil equivalent per day at peak production. |
Original sector | Energy |
Location
Country | United States of America (USA) |
City | New Orleans |
Source
Source | Offshore Technology |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-12-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in United States of America
- Elliott Avenue Sidewalk
- FY 2011 Environmental Studies Program
- Total Costs of Ownership of Future Light-Duty Vehicles
- Rice Creek Floodplain Restoration Project (Enbridge 2010 Oil Spill Kalamazoo River NRDAR)
- Cooperative Ecosystem Studies Unit, Great Rivers CESU
- BLM WY Burrowing Mammal Soils Study Focusing on WY Pocket Gopher (CESU)
- Fiscal Year (FY) 2016 Vehicle Technologies Multi-Topic Funding Opportunity Announcement
- Advanced Technology Solutions for Unconventional Oil and Gas Development
