Atlas Sheikhupura NGCC Power Project
Sector: Water Supply and Storage • Location: Pakistan
Source: World Bank Group
On September 18, 2007, Atlas Power Limited (APL) signed an implementation agreement with Private Power and Infrastructure Board (PPIB) of the Government of Pakistan to build, own, operate and maintain a 225 MW coal based power plant in the city of Sheikhupura, Punjab province. Atlas Power Limited was owned by Atlas Group [Pakistan, 100%].
This power project was to be implemented under the Polic
- Status
- Prospective
- Sector
- Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Government, Commercial
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Atlas Sheikhupura NGCC Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On September 18, 2007, Atlas Power Limited (APL) signed an implementation agreement with Private Power and Infrastructure Board (PPIB) of the Government of Pakistan to build, own, operate and maintain a 225 MW coal based power plant in the city of Sheikhupura, Punjab province. Atlas Power Limited was owned by Atlas Group [Pakistan, 100%]. This power project was to be implemented under the Policy for Power Generation Projects 2002 that clearly laid out the incentives and regulatory regime for private investments in power generation. Prior to financial close, APL had entered into formal agreement with PPIB, 25 year power purchase agreement (signed September 2007) with the the Pakistan Water and Power Development Authority (WAPDA) and fuel supply agreement with Attock Petroleum Limited, signed October 2007. According to the 2002 Policy for Power Generation Projects, projects were awarded to the bidder who submitted the lowest tariff. Further information on how this project was awarded to APL was not available from public sources. The total cost of this project was estimated at $150 million. The project reached financial closure in November 2007 with the signing of the financial closure documents between Atlas Power Limited and the Private Power and Infrastructure Board. The power plant was commissioned in December 2009. The project also held a GOP Guarantee signed November 2007. |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project