ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2014
Sector: Power Transmission • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project covers the operational costs of the TMC and the Navigator system statewide. This includes the contract for Operations and Support at the TMC currently held by Atkins. It also includes all the utility costs (power and communications) for the Navigator cameras, message signs, ramp meters and detection systems statewide. Maintenance and repair costs associated with the TMC building are a
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Commercial, Residential, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2014
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project covers the operational costs of the TMC and the Navigator system statewide. This includes the contract for Operations and Support at the TMC currently held by Atkins. It also includes all the utility costs (power and communications) for the Navigator cameras, message signs, ramp meters and detection systems statewide. Maintenance and repair costs associated with the TMC building are also included such as landscaping, janitorial services, elevator maintenance and HVAC. Staff salaries of those in Traffic Operations directly working on the Navigator project are covered by this project. Office supplies for the TMC are included. Purchase of traffic data from third parties on areas outside Atlanta are included. Purchase and installation of new devices for enhanced surveillance coverage or traffic detection may also be a part of this project. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial, Residential, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
