ATMS: SURVEILLANCE AND CMS, ENHANCEMENT EXISTING SYSTEM
Sector: Broadband • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project is a Fast Forward project designed to "fill in the gaps" of ITS coverage on some of the earliest phases of Navigator installations (those that were installed before the Olympics in 1996). There are several blind spots where cameras are not located, and also places along the freeways where message signs (CMS) are needed, but were not installed initially.
This project will install
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is a Fast Forward project designed to "fill in the gaps" of ITS coverage on some of the earliest phases of Navigator installations (those that were installed before the Olympics in 1996). There are several blind spots where cameras are not located, and also places along the freeways where message signs (CMS) are needed, but were not installed initially. This project will install 6 new 3 x 15 CMS on various freeways around metro Atlanta. It will also install approximately 15 new CCTV cameras. Most of the new cameras will be installed on existing poles. However, one new pole will be required. The project will include the installation of the new devices as well as the complete hook-up into the Navigator system. Existing communications (fiber optic cable) will be used to communicate from TMC to the new devices. The latest GDOT specs for ITS will be used. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- 3625 South Port Drive Cell Tower Zoning Verification Letter
- Mann Road Wireless Communication Facility (UPP-SPP-DRS)
- Verizon Mayhew
- ARC Library Wireless Communications Facility
- T-Mobile Bowling Green Park Communication Facility (UPP-DRS)
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
